Standard Protective Packing Process
- Step 1. Protective tape protects frames from scratches;
- Step 2. Keep windows or doors fixed on iron pallets;
- Step 3. Tie up windows or doors on the iron pallets with plastic belts;
- Step 4. PE films to keep away from sea water;
- Step 5. Fill in the space between each two iron pallets by air bags;
- Step 6. Tie up iron pallets in container with plastic belts.
Our packages ensure the windows and doors arrive at the project job site in optimal condition.
Delivery Detail: 38-45 days following order confirmation.
What is a thermal break aluminum window profile?
A thermal break aluminum profile features an insulated barrier inserted between the interior and exterior aluminum frames. This thermal bridge drastically reduces heat transfer, boosting energy efficiency and indoor comfort.
What are the advantages of combining an outswing awning window with a top fixed window?
This combination maximizes natural light through the upper fixed glass while offering controlled ventilation and rain protection with the bottom outswing awning window.
Can these awning windows prevent water leakage during heavy rain?
Yes, outswing awning windows naturally shed water away from the opening. Combined with high-grade sealing strips and precise frame joinery, they offer excellent weather resistance.
How are the windows protected against damage during sea freight?
Windows are wrapped with protective tape, secured to iron pallets with durable belts, wrapped in PE moisture-proof film, and stabilized with airbag buffers inside the shipping container.
What is the standard production and delivery lead time?
The typical delivery timeline ranges between 38 to 45 days after technical drawing confirmation and deposit verification.